4.6 Article

Scheduling a dual-resource flexible job shop with makespan and due date-related criteria

期刊

ANNALS OF OPERATIONS RESEARCH
卷 291, 期 1-2, 页码 5-35

出版社

SPRINGER
DOI: 10.1007/s10479-019-03196-0

关键词

Dual-resource constrained job shop; Makespan and mean tardiness criteria; Reactive scheduling; Iterated greedy constructive heuristic

向作者/读者索取更多资源

Current struggles for customer satisfaction in make-to-order companies focus on product customization and on-time delivery. For better management of demand-mix variability, production activities are typically configured as flexible job shops. The advent of information technology and process automatization has given rise to very specific training requirement for workers, which indeed turns production scheduling into a dual-resource constrained problem. This paper states a novel dual-resource constrained flexible job-shop problem (DRCFJSP) whose performance considers simultaneously makespan and due date-oriented criteria, where eligibility and processing time are both dependent on worker expertise. Our research comes from an automobile collision repair shop with re-scheduling needs to react to real-time events like due date changes, delay in arrival, changes in job processing time and rush jobs. We have developed constructive iterated greedy procedures that performs efficiently on the large-scale bi-objective DRCFJSP arisen (good schedules in < 5 s), hence providing planners with the required responsiveness in their scheduling of repairing orders and allocation of workers at the different work centres. In addition, computational experiments were conducted on a test bed of smaller DRCFJSP instances generated for benchmarking purposes. Off-the-shelf resolution for an 80% of the medium-sized instances is not fruitful after 9000 s.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据