Analysis of the Transmission of Project Duration and Cost Impacts Based on the GERT Network Technique

期刊

SYMMETRY-BASEL
卷 11, 期 3, 页码 -

出版社

MDPI
DOI: 10.3390/sym11030337

关键词

risk transmission; GERT network technique; cost loss transmission; duration gain-loss transmission

资金

  1. National Natural Science Foundation of China [51709116]
  2. Key Scientific Research Projects of Henan Province Universities and Colleges [17B570003]

向作者/读者索取更多资源

In engineering projects, project duration and a cost increase occur in every phase and will propagate their impacts downstream. Associated with the compensation of project duration, the duration and cost impacts are transferred among phases. In this paper, after illustrating the transmission of project duration and cost impacts, we will use the risk transmission theory and GERT (Graphic Evaluation and Review Technique) network technique to build a transmission model. We have designed equivalent parameters of project duration and cost impacts in the GERT model for serial, parallel, and hybrid structures. The algorithm of the GERT network for project cost and duration transmission is analyzed. The effectiveness of this model and algorithm is proved by numerical examples. This paper provides a new analytical method for cost and duration control of engineering projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据