4.7 Article

Characteristic and Mechanism of Roof Fracture Ahead of the Face in an LTCC Panel When Passing an Abandoned Roadway: A Case Study from the Shenghua Coal Mine, China

期刊

ROCK MECHANICS AND ROCK ENGINEERING
卷 52, 期 8, 页码 2775-2788

出版社

SPRINGER WIEN
DOI: 10.1007/s00603-019-01751-6

关键词

Longwall top coal caving (LTCC); Roof fracturing occurring in front of a face; Working resistance; Impact load; Failure mechanism

资金

  1. National Natural Science Foundation of China [51704204]

向作者/读者索取更多资源

Due to the abandonment of roadways after the use of conventional mining techniques, fracture behaviours of the roof of a longwall top coal caving (LTCC) working face significantly differ from general coal mining behaviours. This study examines conditions of the no. 3 LTCC working face of the Shenghua coal mine. By theoretical analyses, analogue simulation tests and numerical calculations, we examined the roof failure characteristics, forces acting on supports, and action characteristics of abutment stress observed in front of a longwall face when an abandoned roadway was installed in front of a cave working face. We formed the following conclusions. First, due to effects of abandoned roadways and roof-caving regions in front of the working face, the roof of the working face exhibited advanced fracture characteristics. Second, stress exerted on the surrounding rock of the working face showed a different distribution pattern than that of the coal mining face, with supporting stress noticeably concentrated at the pillar. Third, as hydraulic supports have been subjected to the impact load of the fractured roof, supports have poorly adapted, with a maximum working resistance of 14,000 kN. These conditions may cause serious accidents due to the supports' failure or hydraulic cylinders' breakage. Fourth, based on a statically indeterminate equation and the superposition principle, the critical condition of roof fracturing occurring in front of a working face was measured, and the critical width of an abandoned roadway that spurs advanced fracturing in the working face of the Shenghua coal mine was calculated as 6.2 m. Last, to ensure the stability of the surrounding rock and panel supports, a pre-filling scheme of the abandoned roadway is proposed.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据