4.7 Article

Techno-economic optimisation of offshore wind farms based on life cycle cost analysis on the UK

期刊

RENEWABLE ENERGY
卷 132, 期 -, 页码 439-454

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.renene.2018.07.146

关键词

Life Cycle Cost; NSGA II; Multi-objective optimisation; Round 3; UK; Sensitivity analysis

资金

  1. UK Engineering and Physical Sciences Research Council (EPSRC) [EP/L016303/1]

向作者/读者索取更多资源

In order to reduce the cost of energy per MWh in wind energy sector and support investment decisions, an optimisation methodology is developed and applied on Round 3 offshore zones, which are specific sites released by the Crown Estate for offshore wind farm deployments, and for each zone individually in the UK. The 8-objective optimisation problem includes five techno-economic Life Cycle Cost factors that are directly linked to the physical aspects of each location, where three different wind farm layouts and four types of turbines are considered. Optimal trade-offs are revealed by using NSGA II and sensitivity analysis is conducted for deeper insight for both industrial and policy-making purposes. Four optimum solutions were discovered in the range between 1.6 pound and 1.8 pound billion; the areas of Seagreen Alpha, East Anglia One and Hornsea Project One. The highly complex nature of the decision variables and their interdependencies were revealed, where the combinations of site-layout and site-turbine size captured above 20% of total Sobol indices in total cost. The proposed framework could also be applied to other sectors in order to increase investment confidence. (C) 2018 The Author(s). Published by Elsevier Ltd.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据