期刊
RELIABILITY ENGINEERING & SYSTEM SAFETY
卷 183, 期 -, 页码 143-152出版社
ELSEVIER SCI LTD
DOI: 10.1016/j.ress.2018.11.012
关键词
Exponential distribution; Maximal benefit; Preventive maintenance; Repairable system; Repair time limit; Symmetric distribution
资金
- Ferdowsi University of Mashhad [2/47515]
In the optimization of maintenance policies, when a repairable system fails, an important question that arises is whether the system should be repaired or replaced by a new system. This paper deals with this problem and presents a policy to decide between repairing or replacing a system that has failed. Upon taking into account the costs involved, an optimal policy is developed that maximizes the benefit per unit time for repair and replacement. It is assumed that preventive maintenance is performed periodically thus increasing the lifetime of the system, and as a result delaying its failure. Perfect and imperfect repairs are considered to find the solution. Numerical computations are given to study the effect of model parameters on the optimal solutions. The proposed plan is used on a real data set containing failure times and repair times.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据