JOURNAL OF INTELLIGENT & FUZZY SYSTEMS
卷 36, 期 2, 页码 1375-1387出版社
IOS PRESS
DOI: 10.3233/JIFS-172252
关键词
Project critical path; marble processing plant; Pythagorean fuzzy sets (PFSs); group decision-making methodology; decision makers' weights; TOPSIS; COPRAS
Uncertainty plays an important role in project decision-making problems that involve incomplete and imperfect information of real-world situations. To completely considering the uncertainty of decision-making methods, Pythagorean fuzzy sets (PFSs) are used. PFSs in comparisons with classic fuzzy sets provide degrees of membership, non-membership and hesitancy, and in comparisons with intuitionistic fuzzy sets (IFSs), they prepare the larger space to explain the agreement, disagreement and hesitancy grades. In this paper, to tackle the uncertainty of real-world projects and determine the critical path of projects by considering efficient criteria, such as time, cost, risk, quality and safety, a new group decision methodology is extended based on concepts of technique for order of preference by similarity to ideal solution (TOPSIS) and complex proportional assessment (COPRAS) methods under PFSs. Furthermore, a new modified version of the proposed methodology is used to specify the weight of each expert. Finally, a case study from the literature, concerning workflow schema of marble processing plants project, is presented to better express the capability of the proposed methodology.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据