Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study

期刊

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 57, 期 10, 页码 3311-3333

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2019.1581955

关键词

green manufacturing; energy consumption; constructive heuristic; sequence-dependent setup times; flowshop scheduling

向作者/读者索取更多资源

Increasing global energy consumption, large variations in its cost and the environmental degradation effects are good reasons for the manufacturing industries to become greener. Green shop floor scheduling is increasingly becoming a vital factor in the sustainable manufacturing. In this paper, a green permutation flowshop scheduling problem with sequence-dependent setup times is studied. Two objectives are considered including minimisation of makespan as a measure of service level and minimisation of total energy consumption as a measure of environmental sustainability. We extend a bi-objective mixed-integer linear programming model to formulate the stated problem. We develop a constructive heuristic algorithm to solve the model. The constructive heuristic algorithm includes iterated greedy (CHIG) and local search (CHLS) algorithms. We develop an efficient energy-saving method which decreases energy consumption, on average, by about 15%. To evaluate the effectiveness of the constructive heuristic algorithm, we compare it with the famous augmented epsilon-constraint method using various small-sized and large-sized problems. The results confirm that the heuristic algorithm obtains high-quality non-dominated solutions in comparison with the augmented epsilon-constraint method. Also, they show that the CHIG outperforms the CHLS. Finally, this paper follows a case-study, with in-depth analysis of the model and the constructive heuristic algorithm.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据