A bi-level robust planning model for active distribution networks considering uncertainties of renewable energies

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ijepes.2018.09.032

关键词

Active distribution system; Second-order cone programming (SOCP); Column and constraint generation (CCG); Renewable uncertainties; Robust optimization

资金

  1. National Key R&D Program of China [2016YFB0900400]
  2. Sciences and Technology Project of State Grid Corporation of China [PD71-17-014]
  3. Fundamental Research Funds for the Central Universities [YJ201750]
  4. National Science Foundation of China [51807125]

向作者/读者索取更多资源

The distribution companies will face huge challenges in upgrading the existing network due to the uncertain integration of distributed renewable generations. In this paper, we propose a bi-level robust planning model for active management elements (AMEs) including on-load tap changer (OLTC), electrical storage system (ESS), capacitor bank (CB), and static VAR compensation (SVC) in order to accommodate uncertain development of wind power and photovoltaic power. The planning problem is constructed in two levels which are investment level and operation level. To overcome the poor convergence of the bi-level model, variables in both investment level and operation level are associated together. After equivalent transformation for non-linear terms the planning model can be formulated as a mixed integer second order conic programming (MISOCP) problem by some special means such as second order conic relaxation (SOCR) and big-M approach. We address the renewable uncertainties in four different seasons by a typical budget uncertainty set with adjustable budget. Then a two-stage robust mathematical model is proposed to decide a robust AME deployment scheme and solved by column and constraint generation (CCG) algorithm.