4.4 Article

Evaluation whether photovoltaic distributed generation postpones or anticipates reinforcements detected by distribution network expansion planning

期刊

IET GENERATION TRANSMISSION & DISTRIBUTION
卷 13, 期 7, 页码 1036-1048

出版社

INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/iet-gtd.2018.6316

关键词

distributed power generation; optimisation; photovoltaic power systems; power transmission planning; power distribution planning; distribution networks; load flow; utilities; optimisation studies; distribution network expansion planning; load growth; planning horizon; considering DG integration; greater generation; photovoltaic distributed generation postpones; network performance

向作者/读者索取更多资源

There is a growth of distributed generation (DG) impacting the network. There are several studies which focus on defining the location and size of DG to optimise network performance. However, this approach is only possible in a market regulation where utilities can control the DG. Otherwise, this information depends on the consumer and not on the utilities. In this case, the optimisation studies do not make sense anymore. This work aims to identify if the distribution network expansion planning (DNEP) will be changed by the DG integration in a scenario where DG is not controlled by the utilities. The method consists of performing load flows in the feeder considering the load growth during the planning horizon to calculate voltage levels, currents and technical losses. Then, the procedures are repeated considering DG integration in many penetration levels, after that, the results are compared. The results showed that, for the feeder under study, the critical hours do not necessarily occur at the period of peak load, but in the moments with greater generation and smaller load. Therefore, the focus of the DNEP should be changed when considering DG integration.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据