4.5 Article

Grid Investment and Support Schemes for Renewable Electricity Generation

期刊

ENERGY JOURNAL
卷 40, 期 2, 页码 195-220

出版社

INT ASSOC ENERGY ECONOMICS
DOI: 10.5547/01956574.40.2.jwag

关键词

Renewable energy investment; Transmission investment; Coordination problem; External effects

资金

  1. German Research Foundation [HO 5108/2-1]

向作者/读者索取更多资源

The unbundling of formerly vertically integrated utilities in liberalized electricity markets led to a coordination problem between investments in the regulated electricity grid and investments into new power generation. At the same time investments into new generation capacities based on weather dependent renewable energy sources such as wind and solar energy are increasingly subsidized with different support schemes. Against this backdrop this article analyzes the locational choice of private wind power investors under different support schemes and the implications on grid investments. I find that investors do not choose system optimal locations in feed-in tariff schemes, feed-in premium schemes and subsidy systems with direct capacity payments. Consequently, inefficiencies arise if transmission investment follows wind power investment. A benevolent transmission operator can implement the first-best solution by anticipatory investment behavior, which is however only applicable under perfect regulation. Alternatively a location dependent network charge for wind power producers can directly influence investment decisions and internalize the grid integration costs of wind power generation.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据