期刊
COMPUTERS & CHEMICAL ENGINEERING
卷 121, 期 -, 页码 540-555出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.compchemeng.2018.11.014
关键词
Forward and reverse supply chain; Fully fuzzy stochastic programming (FFSP); Multi-objective model (MOM); Closed-loop supply chain; Optimization
资金
- NSERC Discovery grant (RGPIN-2017)
The configuration of facility locations is a strategic decision which is impossible to be changed in a short-term. There are several parameters incorporating to make such decision that fluctuate in different situations. Those unpredictable changes cause some risks and complexities for the businesses in long-run. The objective of this research is to design a multi-echelon lead acid battery closed-loop supply chain (CLSC) network under uncertainty. To this aim, a fully fuzzy programming (FFP) method and stochastic programming are integrated (FFSP) to address various scenarios to maximize network's profit. Furthermore, second objective is introduced to maximize the environmental compliance of suppliers, plants, and battery recovery centers. Then, distance technique is utilized for solving the fuzzy stochastic multi-objective problem. The application of the proposed model is illustrated in a network in Winnipeg, Canada. (C) 2018 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据