Optimisation of heat exchanger network cleaning schedules: Incorporating uncertainty in fouling and cleaning model parameters

期刊

COMPUTERS & CHEMICAL ENGINEERING
卷 121, 期 -, 页码 409-421

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.compchemeng.2018.11.009

关键词

Optimal control problem; Bang-bang control; Fouling; Parametric uncertainty

资金

  1. Ministry of Higher Education in the Sultanate of Oman
  2. Petroleum Development Oman (PDO)

向作者/读者索取更多资源

The optimisation of the cleaning schedule in heat exchanger networks (HENs) subject to fouling is presented in which the impact of parametric uncertainty is considered. This work is based on the realisation that these HEN cleaning scheduling problems are multistage mixed-integer optimal control problems (MIOCPs) in which the controls, i.e. cleaning actions, exhibit bang-bang behaviour as they occur linearly in the system equations. A multiple scenario feasible path MIOCP approach is proposed, whereby many scenarios of the HEN multiperiod problems are stacked, sharing the same control actions. This is implemented on a 10 unit and a 25 unit HEN case studies representing crude oil refinery preheat trains (PHTs). Results show that there is a large difference in financial performance for the deterministic case versus the parametric uncertainty problem and hence it is vital that uncertainty be taken into account during the optimisation of schedules for HEN maintenance problems. (C) 2018 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据