4.4 Article

Fast Analysis of Optimal Improved-Oil-Recovery Switch Time Using a Two-Factor Production Model and Least-Squares Monte Carlo Algorithm

期刊

SPE RESERVOIR EVALUATION & ENGINEERING
卷 22, 期 3, 页码 1144-1160

出版社

SOC PETROLEUM ENG
DOI: 10.2118/191327-PA

关键词

-

资金

  1. Research Council of Norway
  2. ConocoPhillips Skandinavia AS of The National IOR Centre of Norway
  3. Aker BP ASA of The National IOR Centre of Norway
  4. Eni Norge AS of The National IOR Centre of Norway
  5. Total E& P Norge AS of The National IOR Centre of Norway
  6. Equinor ASA of The National IOR Centre of Norway
  7. Neptune Energy Norge AS of The National IOR Centre of Norway
  8. Lundin Norway AS of The National IOR Centre of Norway
  9. Halliburton AS of The National IOR Centre of Norway
  10. Schlumberger Norge AS of The National IOR Centre of Norway
  11. Wintershall Norge AS of The National IOR Centre of Norway
  12. DEA Norge AS of The National IOR Centre of Norway

向作者/读者索取更多资源

Simple or proxy production models are potentially very useful and tractable because they are computationally attractive while still providing insights into the decisions at hand. Useful and tractable models are required for supporting high-quality decisions in uncertain, complex, and computationally demanding contexts. A key decision for development planning is determining the optimal time to begin an improved-oil-recovery (IOR) process. We aim to illustrate the implementation and application of a useful and tractable approach for analyzing the optimal IOR switch time using a two-factor production model and the least-squares Monte Carlo (LSM) algorithm. The two-factor production model contains only two parameters for each recovery phase. One parameter describes how much recovery efficiency a recovery mechanism can ultimately achieve, and the other describes how fast the recovery efficiency increases. The simplicity of the model makes it computationally attractive. Our modified LSM algorithm is an approximate dynamic programming approach, which allows for learning over time. It provides a near-optimal solution for the IOR switch-time problem. The value-ofinformation (VOI) framework, which is a powerful decision-analysis tool, provides an estimate of the value of learning. Closed-loop reservoir management (CLRM) is considered to be a state-of-the-art approach to solving for the optimal IOR switch time. However, the CLRM approach can produce a suboptimal solution because it considers only uncertainties and actions reflecting currently available information, but not those uncertainties and actions arising from future information. The dynamic programming approach used here considers both the effect of the information obtained before a decision is made and the effect of the information that might be obtained to support future decisions. We conclude that a dynamic programming approach, such as the modified LSM algorithm, can significantly improve both the timing and value of decisions, leading to a significant increase in a field's economic performance. Furthermore, the two-factor model combined with the modified LSM algorithm is tractable and provides useful insights into the IOR switch-time problem. The novelties provided by this work are developing and illustrating the structure of the IOR switch-time problem using a decision tree; demonstrating and discussing the suboptimality of the CLRM solution; developing and illustrating the detailed steps of applying the modified LSM algorithm for the IOR switch-time decision; and implementing the two-factor model combined with the modified LSM algorithm for analyzing the optimal IOR switch time.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据