4.6 Article

Economic analysis of thorium extraction from monazite

期刊

NUCLEAR ENGINEERING AND TECHNOLOGY
卷 51, 期 2, 页码 631-640

出版社

KOREAN NUCLEAR SOC
DOI: 10.1016/j.net.2018.11.005

关键词

ThO2; Extraction plant; Monazite; Cost analysis; Direct cost; Indirect cost; Capital investment

资金

  1. Universiti Kebangsaan Malaysia [GGPM-2017-084]

向作者/读者索取更多资源

Thorium (Th-232) is four times more abundant than uranium in nature and has become a new important source of energy in the future. This is due to the ability of thorium to undergo the bombardment of neutron to produce uranium-233 (U-233). The aim of this study is to investigate the production cost of thorium oxide (ThO2) resulted from the thorium extraction process. Four main parameters were studied which include raw material and chemical cost, total capital investment, direct cost and indirect cost. These parameters were justified to obtain the final production cost for the thorium extraction process. The result showed that the raw material costs were $63,126.00 -$104,120.77 (0.5 ton), $126,252.00 - $178,241.53 (1.0 ton), and $1,262,520.00 -$1,782,415.33 (10.0 tons). The total installed equipment and total cost investment were estimated to be approximately $11,542,984.10 and $13,274,431.715 respectively. Hence, the total costs for producing 1 kg ThO2 were $6829.79- $6911.78, $3540.95 - $3592.94, and $501.18 - $553.17 for 0.5, 1.0, and 10.0 tons respectively. The result concluded that with higher mass production, the cost of 1 kg ThO2 would be reduced which in this scenario, the lowest production cost was $501.18 kg(-1) - $553.17 kg(-1) for 10.0 tons of ThO2 production. (C) 2018 Korean Nuclear Society, Published by Elsevier Korea LLC.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据