期刊
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
卷 70, 期 7, 页码 1164-1178出版社
TAYLOR & FRANCIS LTD
DOI: 10.1080/01605682.2018.1506546
关键词
Project management; opportunity cost; project portfolio selection; project schedule; fixed assets; project divisibility
资金
- National Natural Science Foundation of China [71772060]
This paper addresses project portfolio selection with divisibility, where cash flow and opportunity cost are simultaneously considered for the first time. If a project is selected, fixed assets required to execute the project will be occupied during its lifetime. The opportunity cost should be considered due to the commitment of fixed assets. An integrated profit analysis method is proposed to simultaneously consider cash flow and opportunity cost in divisible project portfolio selection. To derive the combination of projects as well as the schedule of selected projects, a mixed integer linear program is provided. A real-world case is used to illustrate the capability and characteristics of our proposed models.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据