4.7 Article

Performance of a coal pillar at deeper cover: Field and simulation studies

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.ijrmms.2018.10.006

关键词

-

资金

  1. Research and Development for Innovations Operational Programme - Structural Funds of the European Union [CZ.1.05/2.1.00/03.0082, MSMT LO1406]
  2. Czech Republic Project [RVO: 68145535]

向作者/读者索取更多资源

Exhaustion of coal reserve, extractable by conventional longwall method of working at Czech mines, provided an opportunity to try modified Room and Pillar (R&P) method to extract high grade coal locked-up in larger shaft protection pillar at around 900 m depth. The shaft pillar is divided into various R&P panels and the development process in a panel followed a constant gallery width of 5.2 m and 3.5 m height. This development in the shaft pillar by bolter miner resulted oblique and inclined pillars of 860-1225 m(2) area. Stability of these pillars is realised to be vital for optimum recovery of high-grade coal from these panels. No empirical formulation is found suitable for the design of pillars at such a depth. Therefore, an attempt is made to select a better representing one through comparative study of the available formulation. CMRI formula is found to be an alternative solution for designing pillars at this depth as it contains depth of cover as a design parameter. This parameter in the formulation is included to take care of the in situ stress conditions and compactness of the material at higher depth of cover. Further, a number of geo-technical instruments are installed in two pillars of Panel V for an analysis of their stability during the development. An attempt is made to develop a strain-softening based numerical modelling approach, calibrated by field studies and CMRI empirical formulation, to assess pillar performance at deeper cover. This development is found to be helpful in pillar stability analysis, when the installed instruments ceased to work. Further, an apprehension of pillar failure by extrapolation of field results is not confirmed on simulated models. This paper briefly presents a discussion of difficulties involved in pillar design at higher depth followed by results of field and simulation conducted for the deep Czech mine.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据