4.5 Article

Selection of dispute resolution methods: factor analysis approach

出版社

EMERALD GROUP PUBLISHING LTD
DOI: 10.1108/09699981211237120

关键词

Construction management; Dispute resolution; Factor analysis; Construction industry; Malaysia

向作者/读者索取更多资源

Purpose - The purpose of this research is to discover the behavior of dispute resolution in the Malaysian construction industry by analyzing factors that affect the selection of dispute resolution methods using factor analysis approach. Design/methodology/approach - Preliminary interviews and a questionnaire survey were conducted. Dispute resolution methods were grouped and discussed together, based on the similarity of their characteristics, and used for the questionnaire survey. This research approach is different from the earlier studies that mostly focused on a single dispute resolution method. The data were further analyzed with factor analysis. This improved the data interpretation. Findings - Seven latent factors were extracted and revealed that the contractors and developers preferred alternative dispute resolution (ADR). However, the appreciation of the outcomes of ADR was perceived to be very low. Arbitration and litigation were in part accepted and agreed upon by the respondents. Originality/value - The combined results from the literature review on the stages of dispute resolution and the latent factors affecting the selection of dispute resolution methods could assist in decision making. The selection of ADR or non-ADR itself is not a major issue; rather, there is a concern for increased efficiency and an appreciation of the methods in the construction industry are more demanding.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据