4.6 Article

In-situ restoring nitrogen removal for the combined partial nitritation-anammox process deteriorated by nitrate build-up

期刊

BIOCHEMICAL ENGINEERING JOURNAL
卷 98, 期 -, 页码 127-136

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.bej.2015.02.028

关键词

Integrated processing; Waste-water treatment; Batch processing; Microbial growth; Hydroxylamine; Solids retention time

资金

  1. National Water Pollution Control and Management Technology Major Project [2012ZX07203-002]
  2. Beijing Science and Technology Special Project [Z131109002813040]

向作者/读者索取更多资源

The nitrogen removal performance in the combined partial nitritation-anammox (CPNA) process was seriously deteriorated by the nitrate build-up. The purpose of this study was to develop and optimize an in-situ restoring strategy based on hydroxylamine (NH2OH) dosing and solids retention time (SRT) control for the deteriorated CPNA process. Results showed that the 0.55 kgN m(-3) d(-1) of nitrogen removal rate could be recovered by 20 mgNH(2)OH L-1 of hydroxylamine dosing and 40 days of SRT control, the nitrate concentration in effluent was decreased from the highest 548.4 mgN L-1 during deterioration to 65.1 mgN L-1 after restoration, and the ratio of NO3--N-produced/NH4+-N-consumed in one SBR cycle was reduced from the highest 87.0% to 9.13% finally. The inhibition of nitrite-oxidizing bacteria (NOB) by NH2OH dosing alone was reversible because the nitrate build-up occurred again from 106.9 to 287.6 mgN L-1 within just 11 days after NH2OH dosing was stopped. The evolution of the anammox bacteria, ammonium-oxidizing bacteria (AOB) and NOB from quantitative PCR (qPCR) assays verified the changes of the nitrogen removal performance of the CPNA process and proved that this in-situ restoration strategy could successfully solve the problem of nitrate build-up in the CPNA process. (C) 2015 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据