Hybrid (fuzzy-stochastic) modelling in construction operations management

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s13042-012-0093-9

关键词

Hybrid models; Fuzzy estimators; Construction operations management; Activity duration

向作者/读者索取更多资源

In this work we apply hybrid (fuzzy-stochastic) modelling in construction operations management (COM). One of the most prevailing methods for the COM is the Program (or Project) evaluation review technique, mostly known as PERT. Nevertheless, both classic and fuzzy PERT presents evident drawbacks. Such drawbacks are the subjectivity of estimates for activity durations, the specification to a certain beta distribution and the assumption for applicability of this probability distribution to all project activities. Regarding the fuzzy PERT, a major drawback is the arbitrary choice of fuzzy numbers for the activity duration. In an attempt to reduce these drawbacks and reach more realistic results we propose an alternative hybrid (fuzzy-stochastic) approach. By combining the generalized beta distribution and the fuzzy estimators method, we find the fuzzy activity times (earliest start/finish-latest start/finish) of a project network and also a fuzzy probability for an activity's duration to be in a certain time interval. A numerical example is given for thorough comprehension of the proposed method.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据