相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。Dynamic scheduling of aircraft landings
Julia A. Bennell et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2017)
An Extended Flexible Job Shop Scheduling Model for Flight Deck Scheduling with Priority, Parallel Operations, and Sequence Flexibility
Lianfei Yu et al.
SCIENTIFIC PROGRAMMING (2017)
Dynamic rolling strategy for multi-vessel quay crane scheduling
Daofang Chang et al.
ADVANCED ENGINEERING INFORMATICS (2017)
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
Patricio Lamas et al.
JOURNAL OF SCHEDULING (2016)
Robust execution strategies for project scheduling with unreliable resources and stochastic durations
Na Fu et al.
JOURNAL OF SCHEDULING (2015)
Multi-objective optimization model for multi-project scheduling on critical chain
Wang Wei-xin et al.
ADVANCES IN ENGINEERING SOFTWARE (2014)
A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel
Feng Qiang et al.
CHINESE JOURNAL OF AERONAUTICS (2014)
New continuous-time and discrete-time mathematical formulations for resource-constrained project scheduling problems
Georgios M. Kopanos et al.
COMPUTERS & CHEMICAL ENGINEERING (2014)
A Knowledge-Based Evolutionary Multiobjective Approach for Stochastic Extended Resource Investment Project Scheduling Problems
Jian Xiong et al.
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2014)
Comparing the Performance of Expert User Heuristics and an Integer Linear Program in Aircraft Carrier Deck Operations
Jason C. Ryan et al.
IEEE TRANSACTIONS ON CYBERNETICS (2014)
A Dynamic Scheduling Method of Earth-Observing Satellites by Employing Rolling Horizon Strategy
Qiu Dishan et al.
SCIENTIFIC WORLD JOURNAL (2013)
MILP formulations for single- and multi-mode resource-constrained project scheduling problems
Thomas S. Kyriakidis et al.
COMPUTERS & CHEMICAL ENGINEERING (2012)
Developing a dynamic rolling-horizon decision strategy for yard crane scheduling
Daofang Chang et al.
ADVANCED ENGINEERING INFORMATICS (2011)
Reactive scheduling in the multi-mode RCPSP
Filip Deblaere et al.
COMPUTERS & OPERATIONS RESEARCH (2011)
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
Vincent Van Peteghem et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2010)
A survey of variants and extensions of the resource-constrained project scheduling problem
Soenke Hartmann et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2010)
A Dual-Population Genetic Algorithm for Adaptive Diversity Control
Taejin Park et al.
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2010)
Feasibility Study of Global-Positioning-System-Based Aircraft-Carrier Flight-Deck Persistent Monitoring System
Jeffrey S. Johnston et al.
JOURNAL OF AIRCRAFT (2010)
Differential evolution for solving multi-mode resource-constrained project scheduling problems
N. Damak et al.
COMPUTERS & OPERATIONS RESEARCH (2009)
The multimode resource constrained multiproject scheduling problem: Alternative formulations
Juan Camilo Zapata et al.
AICHE JOURNAL (2008)
A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
Guidong Zhu et al.
INFORMS JOURNAL ON COMPUTING (2006)
Project scheduling under uncertainty: Survey and research potentials
W Herroelen et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2005)
Robust and reactive project scheduling: a review and classification of procedures
W Herroelen et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2004)