期刊
IEEE TRANSACTIONS ON SMART GRID
卷 5, 期 4, 页码 1876-1883出版社
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TSG.2013.2280645
关键词
Microgrid; plug-in electric vehicle (PEV); renewable energy; smart grid; stochastic programming
资金
- U.S. Department of Energy Office of Science laboratory [DE-AC02-06CH11357]
- KETEP [2001T100100424]
- Korea Evaluation Institute of Industrial Technology (KEIT) [20118530020010] Funding Source: Korea Institute of Science & Technology Information (KISTI), National Science & Technology Information Service (NTIS)
Renewable energy resources such as wind and solar are an important component of a microgrid. However, the inherent intermittency and variability of such resources complicates microgrid operations. Meanwhile, more controllable loads (e.g., plug-in electric vehicles), distributed generators (e.g., micro gas turbines and diesel generators), and distributed energy storage devices (e.g., battery banks) are being integrated into the microgrid operation. To address the operational challenges associated with these technologies and energy resources, this paper formulates a stochastic problem for microgrid energy scheduling. The proposed problem formulation minimizes the expected operational cost of the microgrid and power losses while accommodating the intermittent nature of renewable energy resources. Case studies are performed on a modified IEEE 37-bus test feeder. The simulation results demonstrate the effectiveness and accuracy of the proposed stochastic microgrid energy scheduling model.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据