Geotechnical parameters from pressuremeter tests for MRT Blue Line extension in Bangkok

期刊

GEOMECHANICS AND ENGINEERING
卷 5, 期 2, 页码 99-118

出版社

TECHNO-PRESS
DOI: 10.12989/gae.2013.5.2.099

关键词

geotechnical parameters; in situ testing; pressuremeter; mass rapid transit; Bangkok Clay

资金

  1. Stimulus Package 2 (SP2) of Ministry of Education, Thailand under the theme of Green Engineering for Green Society

向作者/读者索取更多资源

Construction of the extension project of the Bangkok MRT Blue Line underground railway was recently started in 2011. The construction of approximately 5 km long underground tunnel and 4 deep excavations of underground station are considered to be the most important geotechnical works. The pressuremeter was selected as a high-quality in situ testing of the soil to evaluate design parameters for the project. In addition, other field and laboratory tests such as vane shear and CK0U triaxial tests were included in the investigation programme. This paper aims to present the ground conditions encountered along the MRT Blue Line extension project as well as the site investigation and interpretation techniques with particular focus on the pressuremeter tests. The results are also compared with the pressuremeter investigation from the previous Bangkok MRT project.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据