4.5 Article

Total factor productivity analysis of a single vertically integrated electricity utility in Malaysia using a Tornqvist index method

期刊

UTILITIES POLICY
卷 28, 期 -, 页码 62-72

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.jup.2013.11.001

关键词

Productivity growth; Electric utility; Tornqvist index method; Malaysia

向作者/读者索取更多资源

The objective of this paper is to measure the total factor productivity (TFP) growth of Tenaga Nasional Berhad (TNB) from 1975 to 2005. Prior to 1995, TNB was essentially the sole electricity provider in Malaysia. However, since 1995 independent power producers (IPPs) have also begun generating electricity, all of which is purchased by TNB under fixed Power Purchase Agreements (PPAs). The introduction of IPPs has reduced the need for TNB to find finance for new power plants. It has been argued that the participation of IPPs in the electricity generation industry should also facilitate improvements in TNB's productivity; however this proposition is yet to be tested. In this study we calculate TFP growth using a Tornqvist index method, finding that there is no direct evidence of productivity improvements attributable to the industry restructuring. Furthermore, it is not clear that consumers have benefited from this, since the PPAs have generally been quite generous to the IPPs in terms of risk sharing and prices paid. (C) 2013 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据