4.6 Article

Modelling data from different sites, times or studies: weighted vs. unweighted regression

期刊

METHODS IN ECOLOGY AND EVOLUTION
卷 3, 期 1, 页码 168-176

出版社

WILEY
DOI: 10.1111/j.2041-210X.2011.00140.x

关键词

coverage rate; measurement error; meta-regression; process error; residual maximum likelihood; weighted regression

类别

资金

  1. University of Otago

向作者/读者索取更多资源

1. We consider the use of weighted regression when modelling data from different sites, times or studies. Our primary focus is on the coverage rate of the 95% confidence interval for the slope parameter when we have a single predictor variable. We use simulation to assess this coverage rate for both weighted and unweighted regression, across a range of scenarios likely to be encountered in ecology. 2. Our results are surprising: unweighted regression will often be more reliable than weighted regression. The well-known advantages of weighted regression are offset by having to estimate the process error variance. Although unweighted regression involves assuming that the measurement error variances are equal, the coverage rate is remarkably robust to departures from this assumption. Unweighted regression will often be more robust because it does not make use of potentially poor information on the measurement error variances. The only situation in which unweighted regression will perform poorly is when there is a strong relationship between the precision of an estimate and its leverage in the regression. We propose a simple diagnostic tool to assess when this might be the case. 3. The implications of our results are important in a management context as they indicate the benefits obtained from using a simple, readily understood approach to combining information.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据