期刊
BUILDING SIMULATION
卷 7, 期 2, 页码 197-204出版社
TSINGHUA UNIV PRESS
DOI: 10.1007/s12273-013-0140-9
关键词
industrial processes; waste heat storage; district heating; GHE system; operation strategy and modeling
A ground heat exchanger system is applied as a way to improve the heat recovery ratio in a project using industrial waste heat recovery for district heating. In order to meet the requirements of industrial processes, the outlet water temperature of the system should be strictly controlled within a range, but the heat transfer power varies with the warming or cooling of the soil. An operation strategy named block by block is implemented and a corresponding model is established. In this strategy, the total area of the system is divided into several blocks. The water flows by a specific combination of blocks at any given time, ensuring the outlet water temperature is relatively stable. By simulation, it is concluded that the strategy is fit for the practice of industrial waste heat storage and extraction.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据