BIM-based integrated approach for detailed construction scheduling under resource constraints

期刊

AUTOMATION IN CONSTRUCTION
卷 53, 期 -, 页码 29-43

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2015.03.008

关键词

Building information modeling; Integrated approach; Work package information; Process simulation model; Particle swarm optimization algorithm; Detailed scheduling

向作者/读者索取更多资源

Building information modeling (BIM) has been recognized as an information technology with the potential to markedly change the Architecture, Engineering, and Construction (AEC) industry, and has drawn attention from numerous scholars within the construction domain. Despite the reported advancements pertaining to BIM in previous studies, the extended use of BIM has not yet reached its full potential. This paper thus presents a BIM-based integrated scheduling approach which facilitates the automatic generation of optimized activity-level construction schedules for building projects under resource constraints, by achieving an in-depth integration of BIM product models with work package information, process simulations, and optimization algorithms. A developed prototype system for panelized building construction as an add-on tool for Autodesk Revit is described. A case study is subsequently presented to demonstrate the methodology. Building on the existing body of research in this field, the key contribution of the proposed research is the in-depth integration of BIM product model with work package information, process simulations, and an optimization model, which provides solutions addressing the challenges of the existing practice with respect to detailed construction scheduling under resource constraints. (C) 2015 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据