4.7 Article

Stochastic Pre-hurricane Restoration Planning for Electric Power Systems Infrastructure

期刊

IEEE TRANSACTIONS ON SMART GRID
卷 6, 期 2, 页码 1046-1054

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TSG.2015.2388736

关键词

Hurricane planning; power system resiliency; resource allocation; stochastic program with recourse

资金

  1. U.S. National Science Foundation [CMMI-1434771, CMMI-1434789]
  2. Electric Power Analytics Consortium [TSG-00114-2014]
  3. Directorate For Engineering
  4. Div Of Civil, Mechanical, & Manufact Inn [1434789] Funding Source: National Science Foundation
  5. Div Of Civil, Mechanical, & Manufact Inn
  6. Directorate For Engineering [1434771] Funding Source: National Science Foundation

向作者/读者索取更多资源

Proactive preparedness to cope with emergencies, especially those of nature origins, significantly improves the resilience and minimizes the restoration cost of electric power systems. In this paper, a proactive resource allocation model for repair and restoration of potential damages to the power system infrastructure located on the path of an upcoming hurricane is proposed. The objective is to develop an efficient framework for system operators to minimize potential damages to power system components in a cost-effective manner. The problem is modeled as a stochastic integer program with complete recourse. The large-scale mixed-integer equivalence of the original model is solved by the Benders' decomposition method to handle computation burden. The standard IEEE 118-bus system is employed to demonstrate the effectiveness of the proposed model and further discuss its merits.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据