4.7 Article

Proof of concept of regional scale hydrologic simulations at hydrologic resolution utilizing massively parallel computer resources

期刊

WATER RESOURCES RESEARCH
卷 46, 期 -, 页码 -

出版社

AMER GEOPHYSICAL UNION
DOI: 10.1029/2009WR008730

关键词

-

资金

  1. Deutsche Forschungsgemeinschaft (DFG) [SFB/TR 32]
  2. U.S. Department of Energy by Lawrence Livermore National Laboratory [DE-AC52-07NA27344]

向作者/读者索取更多资源

We present the results of a unique, parallel scaling study using a 3-D variably saturated flow problem including land surface processes that ranges from a single processor to a maximum number of 16,384 processors. In the applied finite difference framework and for a fixed problem size per processor, this results in a maximum number of approximately 8 x 10(9) grid cells (unknowns). Detailed timing information shows that the applied simulation platform ParFlow exhibits excellent parallel efficiency. This study demonstrates that regional scale hydrologic simulations on the order of 10(3) km(2) are feasible at hydrologic resolution (similar to 10(0)-10(1) m laterally, 10(-2)-10(-1) m vertically) with reasonable computation times, which has been previously assumed to be an intractable computational problem.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据