A new hard rock TBM performance prediction model for project planning

期刊

TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
卷 26, 期 5, 页码 595-603

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.tust.2011.04.004

关键词

TBM performance; Rock mass boreability; Field Penetration Index

向作者/读者索取更多资源

Among the models used for performance prediction of hard rock tunnel boring machines two stand out and are often used in the industry. They include the semi theoretical model by Colorado School of Mines and the empirical model by Norwegian University of Science and Technology in Trondheim (NTNU). While each have their strong points and area of applications, more accurate prediction has been sought by modifying one of the existing models or introduction of a new model. To achieve this, a database of actual machine performance from different hard rock TBM tunneling projects has been compiled and analyzed to develop a new TBM performance prediction model. To analyze the available data and offer new equations using statistical methods, relationships between different geological and TBM operational parameters were investigated. Results of analyzes show that there are strong relationships between geological parameters (like UCS, joint spacing and RQD) and TBM performance parameters specially Field Penetration Index (FPI). In this study, a boreability classification system and a new empirical chart, for preliminary estimation of rock mass boreability and TBM performance is suggested. (C) 2011 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据