4.4 Article

Testing of slab track under heavy axle loads

期刊

TRANSPORTATION RESEARCH RECORD
卷 -, 期 2043, 页码 55-64

出版社

NATL ACAD SCIENCES
DOI: 10.3141/2043-07

关键词

-

资金

  1. FRA's Next Generation High-Speed Rail Program

向作者/读者索取更多资源

In July 2003, two types of slat) tracks, were installed on the high tonnage loop at the Facility for Accelerated Service Testing, Pueblo, Colorado. Direct fixation slab track (DFST) and independent dual block track (IDBT) were installed into a 5 degrees curve. The total slab track test section is 500 ft long, consisting of 250 ft of IDBT and 250 ft of DFST. The transition from each slab to the adjacent ballasted track is in a spiral to tangent track. For 3 years, more than 170 million gross tons of heavy axle load (HAL) traffic was accumulated and the slab track test section was capable of supporting HAL train operations, while maintaining track geometry conditions for a Class 9 track. This paper summarizes part of the test results and the main conclusions of the slab track test, which is described more completely in a report published by the Portland Cement Association.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据