4.7 Article

Constraint programming approach to quay crane scheduling problem

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.tre.2013.08.006

关键词

Quay crane scheduling; Constraint programming; Container terminals; Ready times; Time windows

向作者/读者索取更多资源

This study presents a constraint programming (CP) model for the quay crane scheduling problem (QCSP), which occurs at container terminals, with realistic constraints such as safety margins, travel times and precedence relations. Next, QCSP with time windows and integrated crane assignment and scheduling problem, are discussed. The performance of the CP model is compared with that of algorithms presented in QCSP literature. The results of the computational experiments indicate that the CP model is able to produce good results while reducing the computational time, and is a robust and flexible alternative for different types of crane scheduling problems. (C) 2013 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据