Track maintenance production team scheduling in railroad networks

期刊

TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
卷 46, 期 10, 页码 1474-1488

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.trb.2012.07.004

关键词

Railroad track maintenance; Scheduling; Time-space network model; Side constraints; Multiple neighborhood search

资金

  1. CSX Transportation, Inc.
  2. National Science Foundation [CMMI-0748067]
  3. Div Of Civil, Mechanical, & Manufact Inn
  4. Directorate For Engineering [0748067] Funding Source: National Science Foundation

向作者/读者索取更多资源

US railroad companies spend billions of dollars every year on track maintenance in order to ensure safety and operational efficiency. Optimizing the production team (i.e., large maintenance team) schedule is a very complex problem with major cost implications. In current practice, the decision making process for production team scheduling is largely manual and primarily relies on the knowledge and judgment of experts. This paper addressed the production team scheduling problem by formulating it as a time space network model with many types of challenging side constraints. Some of these constraints are identified from industry practice and formulated for the first time. Multiple neighborhood search and other enhancement algorithms were proposed to solve the model. The proposed modeling approach has been tested through numerical experiments and also applied to large-scale real-world problem instances, and superior computational performances were found. The proposed approach has been adopted by a Class I railroad to help make annual network maintenance scheduling decisions. (C) 2012 Elsevier Ltd. All rights reserved.