This study presents a life cycle cost prediction and cost minimisation methodology for a set of highway concrete bridges, during a medium or a long period of time, in order to facilitate the decision process of the structure management. This methodology takes into consideration bridge intervention costs in addition with some Markov matrices degradation model. It applies a genetic algorithm in order to identify the optimised intervention plan, considering the available budget and the desired minimum performance level. Some Portuguese direct and indirect cost parameters, associated with different types of interventions during bridges lifetime, are presented. Finally, a probabilistic sensitivity analysis is carried out using Monte Carlo simulations.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据