Investigation into performance of deep excavation in sand covered karst: A case report

期刊

SOILS AND FOUNDATIONS
卷 58, 期 4, 页码 1042-1058

出版社

JAPANESE GEOTECHNICAL SOC
DOI: 10.1016/j.sandf.2018.03.012

关键词

Deep excavation; Sand covered karst; Socket diaphragm wall; Ground surface settlement; Grouting

资金

  1. National Nature Science Foundation of China (NSFC) [41672259]
  2. National Basic Research Program of China (973 Program) [2015CB057806]

向作者/读者索取更多资源

Performing deep excavations in karst regions is likely lead to geo-hazards, e.g. sinkholes, water ingress, and ground surface settlement. This case report presents the performance of a 16-m deep excavation in sand covered karst in Metro Line no. 9, Guangzhou, China. The performances during deep excavation, including lateral wall deflection, vertical wall movement, ground surface settlement, and settlement of adjoining buildings, were monitored and evaluated. Based upon the interpretation of the field measurements, the following major findings were obtained: (i) the lateral wall deflection and surface settlement measurements were smaller those cited in other case studies with similar geological conditions, (ii) both the grouting of the karst cavern and the use of the socket diaphragm wall panel dominated the performance of the deep excavation; (iii) the type of the founding structure could significantly affect the settlement development of the adjoining buildings. This case report provides insight into the design and construction of deep, narrow excavations in sand covered karst in a metropolitan environment. (C) 2018 Production and hosting by Elsevier B.V. on behalf of The Japanese Geotechnical Society.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据