4.7 Article

Safety management in tunnel construction: Case study of Wuhan metro construction in China

期刊

SAFETY SCIENCE
卷 62, 期 -, 页码 8-15

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ssci.2013.07.021

关键词

Safety management; Tunnel construction; Ventilation shaft; Complex environments; Freezing method; Numerical analyses

资金

  1. National Science and Technology Support Plan [50978113]
  2. Wuhan City Construction Committee Support Project [201334]
  3. China Scholarship Council (CSC)

向作者/读者索取更多资源

This paper presents a systematic approach for Overall Process Safety Management (OPSM) in tunnel construction, including safety system design, analysis, control and effect assessment. Wuhan Yangtze Metro Tunnel in China is used for a case study. A slurry shield machine is required to pass through Wuhan Ventilation Shaft with a cover depth of 42 m, a hydraulic pressure of 0.44 MPa and a curve radius of 350 m. To deal with the challenging technical issues in such complex environments, various schemes were compared and discussed as to figure out a more reasonable solution for the waterproofing and reinforcing works at first. Then, ANSYS finite element software is employed to simulate a numerical model of the drilling process, investigate the distribution of the stress field in the frozen wall, and to verify the reliability of the selected scheme. Finally, control measures in response to all technical problems are put forward. The OPSM approach can be applied by practitioners in the industry to provide effective guidelines for the safety management in urban tunnel construction, and to increase the likelihood of a successful project in a complex environment. (C) 2013 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据