4.7 Article

A new method for risk assessment of pillar recovery operation

期刊

SAFETY SCIENCE
卷 48, 期 10, 页码 1304-1312

出版社

ELSEVIER
DOI: 10.1016/j.ssci.2010.04.008

关键词

Room and pillar mining; Pillar recovery; Ground control; Risk assessment; Safety

向作者/读者索取更多资源

Safe pillar recovery operations can result in better miner safety and more efficient recovery of ore reserves. Several parameters influence on safety of pillar recovery operation. Each of these parameters is able to reduce safety of operation and cause to detrimental effects during pillar recovery. In this paper, by emphasizing ground control aspects, the most important technical parameters influencing on safety of pillar recovery are introduced and the role of them is described. Then, a new method is presented by combining all of these parameters to assess overall risk of pillar recovery operation in pre-developed room and pillar mines. The proposed method involves calculating the PR-Risk (Pillar Recovery-Risk) indicator. PR-Risk value is between 0 and 100 that based on overall risk of pillar recovery operation divides into four categories: low, medium, high, and very high. PR-Risk is an important indicator for predicting the safety of pillar recovery operation and based on it decision can be made about the safe implementation of operation. Finally, the overall risk of pillar recovery operation in main panel of Tabas Central Mine, located in the mid eastern of Iran, is assessed by use of proposed method in this paper. PR-Risk value in this panel was obtained 51 that show overall risk of operation is medium. Moreover, based on individual assessment of parameters, for the safe implementation of operation and reduction of related risks, reinforcement of roof prior to beginning of operation and partial pillar extraction have been suggested as the most efficient controlling measures. (C) 2010 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据