Numerical Modeling for Yield Pillar Design: A Case Study

期刊

ROCK MECHANICS AND ROCK ENGINEERING
卷 48, 期 1, 页码 305-318

出版社

SPRINGER WIEN
DOI: 10.1007/s00603-013-0539-8

关键词

Coal bumps; Yield pillar design; Numerical modeling; Gob and pillar model; Coal/rock interface strength; Stress analysis

资金

  1. National Natural Science Foundation of China [51174195]

向作者/读者索取更多资源

Two single-entry gateroad systems employing a yield pillar for bump control in a Chinese coal mine were introduced. The overburden depth of the longwall panels was approximately 390 m. When the width/height (W/H) ratio of the yield pillar was 2.67, coal bumps in the tailgate occurred in front of the longwall retreating face. However, in another panel, the coal bump was eliminated because the W/H ratio was reduced to 1.67. Under this condition, instrumentation results indicated that the roof-to-floor and rib-to-rib convergences reached 1,050 and 790 mm, respectively, during longwall retreat. The numerical model was used to back-analyze the two cases of yield pillar application in the hope to find the principle for yield pillar design. In order to improve the reliability of the numerical model, the strain-hardening gob and strain-softening pillar materials were meticulously calibrated, and the coal/rock interface strength was determined by laboratory direct shear tests. The results of the validated model indicate that if the W/H ratio of the yield pillar equals 1.67, the peak vertical stress in the panel rib (37.7 MPa) is much larger than that in the yield pillar (21.1 MPa); however, the peak vertical stress in the panel rib (30.87 MPa) is smaller than that in the yield pillar (36 MPa) when the W/H ratio of yield pillar is 2.67. These findings may be helpful to the design of yield pillars for bump control.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据