4.7 Article

Characteristics of Water Ingress in Norwegian Subsea Tunnels

期刊

ROCK MECHANICS AND ROCK ENGINEERING
卷 47, 期 3, 页码 933-945

出版社

SPRINGER WIEN
DOI: 10.1007/s00603-012-0300-8

关键词

Subsea tunnel; Water ingress; Pre-investigation; Probe drilling; Water sealing

向作者/读者索取更多资源

Water ingress represents one of the main challenges in subsea tunnelling, particularly when this occurs in sections with poor rock mass quality. This paper is discussing the main characteristics of water ingress in subsea hard rock tunnels based on the experience from almost 50 such tunnels that have been built in Norway. Following a brief description of the geological conditions and the basic design of the subsea tunnels, pre-construction investigations and investigations during excavation are discussed with particular emphasis on prediction of water ingress. Two cases with particularly difficult conditions; the Bjoroy tunnel and the Atlantic Ocean tunnel, are discussed in detail. In these cases, large water inflow with pressure of up to 2.4 MPa was encountered at major faults/weakness zones during excavation, and special procedures were required to cope with the problems. Based on the experience from the Norwegian projects, it is concluded that continuous follow-up by experienced engineering geologists, probe drilling with the drilling jumbo and pre-grouting where required are the most important factors for coping with water ingress and ensuring stability.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据