4.7 Article

The Effect of Consolidation on TBM Shield Loading in Water-Bearing Squeezing Ground

期刊

ROCK MECHANICS AND ROCK ENGINEERING
卷 44, 期 1, 页码 63-83

出版社

SPRINGER WIEN
DOI: 10.1007/s00603-010-0107-4

关键词

Tunnel boring machine; Squeezing ground; Shield jamming; Advance rate; Standstill; Consolidation; Numerical investigation; Steady state method

资金

  1. Swiss Tunnelling Society (STS)
  2. Swiss Federal Roads Office (FEDRO)

向作者/读者索取更多资源

Jamming or overstressing of the shield due to ground pressure are potential problems for tunnel boring machine (TBM) tunnelling in squeezing ground. The risk of shield jamming depends essentially on the deformation rate of the ground in the vicinity of the working face. The time-dependency of the ground response to the excavation is associated with its rheological properties as well as with the transient consolidation process that takes place around the opening in the case of a low-permeability saturated ground. The present paper focuses on the second mechanism and investigates the interaction between the advancing shield, tunnel lining and consolidating ground by means of transient numerical analyses. For a given set of geotechnical conditions and a given TBM configuration, the load exerted by the ground upon the shield during TBM operation decreases with increasing gross advance rate. During a long break in operations, the ground pressure may increase significantly, thereby necessitating a higher thrust force to overcome shield skin friction and restart the TBM. It is interesting to note that a high advance rate reduces the risk of shield jamming not only during TBM advance, but is also favourable with respect to any subsequent long standstills.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据