4.3 Article

CONSTRUCTION CONSTRAINTS FOR GEOMORPHIC-UNIT REHABILITATION ON REGULATED GRAVEL-BED RIVERS

期刊

RIVER RESEARCH AND APPLICATIONS
卷 25, 期 4, 页码 416-437

出版社

WILEY
DOI: 10.1002/rra.1173

关键词

river restoration; fluvial geomorphology; river engineering; spawning habitat; adaptive management; post-project appraisals

资金

  1. US Fish and Wildlife Service [113322G003]
  2. EBMUD
  3. CVPIA

向作者/读者索取更多资源

The emergent practice of applied river restoration uses best available equipment and contouring methods to construct detailed designs with some features at scales as small as 0.5-m relief. As part of adaptive management, it is necessary to determine the practicability of design features and construction methods before widespread adoption. In this study, we compared design versus as-built topography for five salmonid spawning habitat rehabilitation projects at riffle-pool geomorphic units on the lower Mokelumne River, California, USA. These were built instream using rubber tire front loaders. Digital elevation models (DEMs) of each site were produced for pre-project, design and as-built conditions. DEM differencing was used to compare the as-built surface against corresponding design surfaces at each site to identify deviations. Causes of each identified deviation were assessed based on subjective observations by a team during construction. Across the projects, 70% of as-built topography was within +/- 0.15 m of design specifications. Of the 30% deviating from the design, 41% was overfilled and 59% underfilled. The 30% of rehabilitated channel area that deviated from designs did not affect predicted areas of high-quality spawning habitat. On-site factors that hindered accurate construction of designs included front loader fording depth, poor operator elevation estimation, operator spatial disorientation and wood obstructions. In addition, funding and project management uncertainties caused gravel supply deficits and gravel bulk density estimation errors. It is concluded that constructing broad (>0.5-m relief) features of process-based salmonid spawning habitat rehabilitation projects by gravel augmentation is practicable. However, uncertainties attributed to human error and available methods inhibit detailed (<0.5-m relief) rehabilitation. Despite uncertainties, limitations and errors, following the recommendations reported in this study would improve the as-built adherence to design specifications of future projects. Copyright (C) 2008 John Wiley & Sons, Ltd.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据