4.6 Article

Defense Resource Distribution Between Protection and Redundancy for Constant Resource Stockpiling Pace

期刊

RISK ANALYSIS
卷 31, 期 10, 页码 1632-1645

出版社

WILEY
DOI: 10.1111/j.1539-6924.2011.01593.x

关键词

Attack; contest success function; defense; delay; protection; redundancy; stockpiling; vulnerability

向作者/读者索取更多资源

The article considers the optimal resource distribution in a parallel system between increasing protection and providing redundancy in a situation when the attacker's and defender's resources are stockpiling and the resource increment rate is constant. It is assumed that the system must perform within an exogenously given time horizon and the attack time probability is uniformly distributed along this horizon. The defender optimizes the resource distribution in order to minimize the system destruction probability during the time horizon. First, we find the optimal pace of construction of the new redundant elements assuming that the construction must start in the initial stage of the stockpiling process. We show that starting construction of new elements in the beginning of the system's existence results in its high initial vulnerability. Introducing the time delay before starting the construction can reduce the initial system vulnerability and the entire system destruction probability. The problem of optimization of time delay and new element construction pace is considered with and without constraint on the initial system vulnerability. Examples illustrating the methodology of the optimal defense strategy analysis are presented.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据