期刊
RENEWABLE ENERGY
卷 54, 期 -, 页码 189-195出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.renene.2012.08.026
关键词
Offshore wind power; Site selection; Korean Peninsula; Economic evaluation
资金
- New & Renewable Energy of the Korea Institute of Energy Technology Evaluation and Planning (KETEP) grant
- Korea government Ministry of Knowledge Economy [20113040020010]
- Korea Evaluation Institute of Industrial Technology (KEIT) [20113040020010] Funding Source: Korea Institute of Science & Technology Information (KISTI), National Science & Technology Information Service (NTIS)
We have conducted a feasibility study on the development of offshore wind farms around the Korean Peninsula as part of the national plan. This study deals with the selection of the optimal site for an offshore wind farm. We set rating indices in order to select an optimal site of the candidate coasts, which include the expected B/C (benefit to cost) ratio, the possible installation capacity of the wind farm, the convenience of grid connection, and so on, for each candidate site. The expected B/C ratio is described as the benefit from the annual energy production compared to the costs that correspond to the construction of the turbine foundation, and the grid connection between the offshore wind farm and the substation on land. It can be found from the evaluation that the construction costs associated with the substructure and grid connection are crucial in determining the location of the first offshore wind farm in Korea. Consequently, we could select a top site among the candidate sites to be implemented as the first national project of offshore wind farm development. (C) 2012 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐