期刊
RENEWABLE ENERGY
卷 35, 期 1, 页码 151-156出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.renene.2009.02.031
关键词
Mixed-integer linear programming; Renewable energy park; Scheduling; Virtual power producer
资金
- FCT
- FEDER
- POCTI
- POSI
- POCI
- POSC
In the energy management of the isolated operation of small power system, the economic scheduling of the generation units is a crucial problem. Applying right timing can maximize the performance of the supply. The optimal operation of a wind turbine, a solar unit, a fuel cell and a storage battery is searched by a mixed-integer linear programming implemented in General Algebraic Modeling Systems (GAMS). A Virtual Power Producer (VPP) can optimal operate the generation units, assured the good functioning of equipment, including the maintenance, operation cost and the generation measurement and control. A central control at system allows a VPP to manage the optimal generation and their load control. The application of methodology to a real case study in Budapest Tech, demonstrates the effectiveness of this method to solve the optimal isolated dispatch of the DC micro-grid renewable energy park. The problem has been converged in 0.09 s and 30 iterations. (C) 2009 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据