4.8 Review

Application of an advanced real options approach for renewable energy generation projects planning

期刊

RENEWABLE & SUSTAINABLE ENERGY REVIEWS
卷 15, 期 4, 页码 2087-2094

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.rser.2011.01.016

关键词

Real options (RO); Uncertainty; Optimization; Mixed-integer nonlinear programming; Hydropower

资金

  1. National Council on Science and Technology (CONACYT) of Mexico

向作者/读者索取更多资源

Nowadays, there is growing interest in renewable energy (RE) generation projects due to environmental and sustainability concerns. However, initial costs and uncertainties caused by RE source variability, changes in support schemes, and other factors can render RE projects unattractive when subject to conventional financial assessment. Initial research suggests that the value of RE projects can be enhanced by the application of real options (RO) theory in the planning and evaluation of such projects. Literature on application of RO planning in RE generation projects is limited, and typically focuses solely on flexible investment decisions and neglects flexible design A more comprehensive approach should address flexibility in designs. This paper proposes an advanced RO methodology for RE generation projects planning, and illustrates the methodology using variations of a hydropower case study. The fundamental differences between advanced RO approaches and other techniques are illustrated on a simple case study. The complete version of the proposed advanced methodology is then compared against other available tools. The results show higher expected profits for projects planned with the advanced RO methodology. (C) 2011 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据