4.8 Review

Geothermal energy resources and development in Iran

期刊

RENEWABLE & SUSTAINABLE ENERGY REVIEWS
卷 13, 期 5, 页码 1127-1132

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.rser.2008.05.004

关键词

Iran; SUNA; Geothermal; Sabalan; Direct use

向作者/读者索取更多资源

Interest in geothermal energy originated in Iran when James R. McNitt, a United Nations geothermal expert, visited the country in December 1974. In 1975, a contract among the Ministry of Energy, ENEL (Entes Nazionale per L'Energia Elettrica) of Italy and TB (Tehran Berkeley) of Iran was signed for geothermal exploration in the north-western part of Iran. In 1983, the result of investigations defined Sabalan, Darnavand, Khoy-Maku and Sahand regions as four prospected geothermal sites in northwestern Iran. From 1996 to 1999, a countrywide geothermal energy resource exploration project was carried out by Renewable Energy Organization of Iran (SUNA) and 10 more potential areas were indicated additionally. Geothermal potential site selection using Geographic Information System (GIS) was carried out in Kyushu University in 2007. The results indicated 8.8% of Iran as prospected geothermal areas in 18 fields. Sabalan as a first priority of geothermal potential regions was selected for detailed explorations. Since 1995, surface exploration and feasibility studies have been carried out and five promising areas were defined. Among those prospective areas, Northwest Sabalan geothermal filed was defined for detailed exploration to justify exploration drilling and to estimate the reservoir characteristics and capacity. From 2002 to 2004, three deep exploration wells were drilled for evaluation of subsurface geological conditions, geothermal reservoir assessment and response simulation. Two of the wells were successful and a maximum temperature of 240 degrees C at a depth of 3197 m was recorded. As a result of the reservoir simulation, a 55-MW power plant is projected to be installed in the Sabalan field as a first in geothermal power generation. To supply the required steam for the geothermal power plant (GPP) 17 deep production and reinjection wells are planned to be drilled this year. (C) 2008 Elsevier Ltd, All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据