4.7 Article

Embedding the human factor in road tunnel risk analysis

期刊

PROCESS SAFETY AND ENVIRONMENTAL PROTECTION
卷 92, 期 4, 页码 329-337

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.psep.2014.03.006

关键词

Road tunnels; Directive 2004/54/EC; Fuzzy systems; CREAM; Risk analysis; Uncertainty representations; HRA

向作者/读者索取更多资源

The paper is focusing on road tunnel safety and builds upon the Directive 2004/54/EC launched by the European Commission; the latter sets basic requirements and suggests the implementation of risk assessment in several tunnel cases apart from technical measures imposed on the basis of tunnel structural and operational characteristics. Since the EU Directive does not indicate the method for performing risk assessment, a wide range of methods have been proposed, most of them based on quantitative risk assessment (QRA). Although the majority of current road tunnel QRAs assess physical aspects of the tunnel system and consider several hazards concerning the transportation of dangerous goods through a tunnel, they do not take into account, sufficiently, several organizational and human-related factors that can greatly affect the overall safety level of these critical infrastructures. To cope with this limitation this paper proposes a fuzzy logic system based on CREAM method for human reliability analysis (Hollnagel, 1998) in order to provide more sophisticated estimations of the tunnel operator's performance in safety critical situations. It is deduced that a human reliability analysis component to analyze operator performance, like the fuzzy system proposed here, is important for risk analysts. Consideration of organizational and human factors will enhance risk analysts' studies and highlight the uncertainty related to human performance variability. (C) 2014 The Institution of Chemical Engineers. Published by Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据