A post-classifying fuzzy-neural approach is proposed in this study for estimating the remaining cycle time of each job in a wafer fabrication plant, which has seldom been investigated in past studies but is a critical task for the wafer fabrication plant. In the methodology proposed, the fuzzy back-propagation network (FBPN) approach for job cycle time estimation is modified with the proportional adjustment approach to estimate the remaining cycle time instead. Besides, unlike existing cycle time estimation approaches, in the methodology proposed a job is not preclassified but rather post-classified after the estimation error has been generated. For this purpose, a back-propagation network is used as the post-classification algorithm. To evaluate the effectiveness of the methodology proposed, production simulation is used in this study to generate some test data. According to experimental results, the accuracy of estimating the remaining cycle time could be improved by up to 64 per cent with the proposed methodology.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据