4.6 Article

Diminishing Availability of Publicly Funded Slots for Antiretroviral Initiation among HIV-Infected ART-Eligible Patients in Uganda

期刊

PLOS ONE
卷 5, 期 11, 页码 -

出版社

PUBLIC LIBRARY SCIENCE
DOI: 10.1371/journal.pone.0014098

关键词

-

资金

  1. National Institutes of Health [K23 AI084544, U01 AI069911, R01 MH054907, P30 AI027763, K24 MH87227]
  2. Mark and Lisa Schwartz Family Foundation
  3. United States President's Emergency Plan for AIDS Relief (PEPFAR)

向作者/读者索取更多资源

Background: The impact of flat-line funding in the global scale up of antiretroviral therapy (ART) for HIV-infected patients in Africa has not yet been well described. Methods: We evaluated ART-eligible patients and patients starting ART at a prototypical scale up ART clinic in Mbarara, Uganda between April 1, 2009 and May 14, 2010 where four stakeholders sponsor treatment - two PEPFAR implementing organizations, the Ugandan Ministry of Health - Global Fund (MOH-GF) and a private foundation named the Family Treatment Fund (FTF). We assessed temporal trends in the number of eligible patients, the number starting ART and tabulated the distribution of the stakeholders supporting ART initiation by month and quartile of time during this interval. We used survival analyses to assess changes in the rate of ART initiation over calendar time. Findings: A total of 1309 patients who were eligible for ART made visits over the 14 month period of the study and of these 819 started ART. The median number of ART eligible patients each month was 88 (IQR: 74 to 115). By quartile of calendar time, PEPFAR and MOH sponsored 290, 192, 180, and 49 ART initiations whereas the FTF started 1, 2, 1 and 104 patients respectively. By May of 2010 (the last calendar month of observation) FTF sponsored 88% of all ART initiations. Becoming eligible for ART in the 3(rd) (HR = 0.58, 95% 0.45-0.74) and 4(th) quartiles (HR = 0.49, 95% CI: 0.36-0.65) was associated with delay in ART initiation compared to the first quartile in multivariable analyses. Interpretation: During a period of flat line funding from multinational donors for ART programs, reductions in the number of ART initiations by public programs (i.e., PEPFAR and MOH-GF) and delays in ART initiation became apparent at the a large prototypical scale-up ART clinic in Uganda.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据