相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。Lot sizing and furnace scheduling in small foundries
Silvio A. de Araujo et al.
COMPUTERS & OPERATIONS RESEARCH (2008)
Pre-emption in resource-constrained project scheduling
Francisco Ballestin et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
Chao-Tang Tseng et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2008)
A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex
Lixin Tang et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2007)
When it is worthwhile to work with the stochastic RCPSP?
Francisco Ballestin
JOURNAL OF SCHEDULING (2007)
Experimental investigation of heuristics for resource-constrained project scheduling: An update
Rainer Kolisch et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2006)
State-of-the-art review of optimization methods for short-term scheduling of batch processes
Carlos A. Mendez et al.
COMPUTERS & CHEMICAL ENGINEERING (2006)
Justification and RCPSP:: A technique that pays
V Valls et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2005)
Optimal and heuristic solutions for a scheduling problem arising in a foundry
SL Nonås et al.
COMPUTERS & OPERATIONS RESEARCH (2005)
Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic
M Gravel et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2002)
A lot-sizing problem in an automated foundry
E dos Santos-Meza et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2002)
A review of planning and scheduling systems and methods for integrated steel production
LX Tang et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2001)
An integrated survey of deterministic project scheduling
R Kolisch et al.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2001)
Project scheduling with multiple modes: A genetic algorithm
S Hartmann
ANNALS OF OPERATIONS RESEARCH (2001)