4.5 Article

Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm

期刊

OPTIMIZATION AND ENGINEERING
卷 13, 期 4, 页码 663-687

出版社

SPRINGER
DOI: 10.1007/s11081-011-9157-z

关键词

Production scheduling; Mixed integer programming; Project scheduling; Metaheuristic algorithms

向作者/读者索取更多资源

This paper describes a real problem in a market-driven medium sized foundry delivering a wide range of castings to different markets. The problem consists of finding an efficient production plan to schedule the different processes (moulding, furnacing, cutting, tooling, etc.) needed to the manufacture of the pieces. Different objectives and resources and technical constraints must be taken into account. To solve this problem we have first developed a more classical integer linear programming approach based on a rolling horizon strategy. The most innovative contribution of the paper is that it models the problem as a project scheduling problem. Based on this model we present a metaheuristic algorithm that adapts techniques from the area. Computational experiments comparing both approaches are provided on instances created by a generator simulating real instances.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据